USCG KODIAK SITE 3 PILOT TEST STUDY

Ahtna Environmental, Inc., (Ahtna) completed a three-phase remedial pilot study to address soil and groundwater impacts resulting from a former dry-cleaning operation at U.S. Coast Guard (USCG) Base Kodiak Site 3. The site was a hazardous waste management unit (HWMU) regulated by Base Kodiak’s Resource Conservation and Recovery Act (RCRA) Read more…

FAA BORON FACILITY LONG RANGE SURVEILLANCE RADAR HVAC REPLACEMENT

Ahtna Environmental, Inc., (Ahtna) was contracted to replace the air conditioning systems which required mechanical and electrical system renovations to the fifth floor.  Additionally, minor mechanical improvements were required on the fourth floor, where the life-critical equipment is located. Rainfall caused rapid surges in the creek during construction work, dismantling Read more…